| Assessment Year | 2017 |
|---|---|
| Principal Product | RV air conditioning |
| NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
156,000
ft2
|
| Annual Production | 450,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $126,221 | 3,078,553 |
kWh
|
$0.041 |
| Electricity Demand | $137,062 | 6,722 |
kW-mo/yr
|
$20.39 |
| Electricity Fees | $17,852 | - |
|
- |
| Natural Gas | $37,647 | 4,913 |
MMBtu
|
$7.66 |
| TOTAL YEARLY COSTS | $318,781 | |||
| RECOMMENDED SAVINGS* | $63,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,201 | $28,109 |
$3,755
91,585
kWh
|
$3,446
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,650 | $9,471 |
$2,919
71,197
kWh
|
$3,731
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $534 | $2,111 |
$534
13,017
kWh
|
- | - | - | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $4,431 | $12,360 |
$1,494
36,451
kWh
|
$2,936
-
kW-mo/yr
|
- | - | |
| 05 | 2.7224: Reduce space conditioning during non-working hours | $2,172 | - |
$280
6,836
kWh
|
- | - |
$1,892
-
MMBtu
|
|
| 06 | 2.7211: Clean and maintain refrigerant condensers and towers | $860 | $769 |
$268
6,544
kWh
|
$591
-
kW-mo/yr
|
- | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,356 | $19,135 |
$10,356
252,596
kWh
|
- | - | - | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,658 | $1,650 |
$3,658
89,213
kWh
|
- | - | - | |
| 09 | 2.2437: Recover waste heat from equipment | $8,097 | $991 | - | - | - |
$8,097
-
MMBtu
|
|
| 10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,050 | $510 |
$1,050
25,603
kWh
|
- | - | - | |
| 11 | 2.4221: Install compressor air intakes in coolest locations | $1,046 | $1,480 |
$1,046
25,521
kWh
|
- | - | - | |
| 12 | 2.3212: Optimize plant power factor | $17,217 | $17,024 | - | - | $17,217 | - | |
| TOTAL RECOMMENDED | $63,272 | $93,610 |
$25,361
618,563
kWh
|
$10,705
-
kW-mo/yr
|
$17,217 |
$9,989
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs