Assessment Year 2023
Principal Product Bread, Buns, and Rolls
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 275
Plant Area 120,000
ft2
Annual Production 89,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $342,261 6,863,832
kWh
Electricity Demand $181,065 12,457
kW-mo/yr
Natural Gas $375,742 51,142
MMBtu
Waste Disposal Costs
Water Usage $26,980 6,238
Tgal
Water Disposal $26,102 6,238
Tgal
TOTAL YEARLY COSTS $952,150
RECOMMENDED SAVINGS* $130,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,041

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $44,264 $3,287 $44,264
887,040
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,378 $10,100 $41,378
829,216
kWh
- - -
03 4.214: Purchase appropriately sized material $18,022 $87,000 - - $18,022
-
MMBtu
-
04 2.2515: Use optimum thickness insulation $14,929 $45,390 - - $14,929
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,663 $1,500 $6,907
138,408
kWh
$2,756
-
kW-mo/yr
- -
06 2.4112: Install soft-start to eliminate nuisance trips $2,088 $4,500 $647
12,963
kWh
- - $1,441
TOTAL RECOMMENDED $130,344 $151,777 $93,196
1,867,627
kWh
$2,756
-
kW-mo/yr
$32,951
-
MMBtu
$1,441
TOTAL IMPLEMENTED $51,041 $11,600 $48,285
967,624
kWh
$2,756
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs