ITAC Assessment: OK0971
ITAC logo
ITAC Assessment: OK0971
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Foundation repair
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 58,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,584 1,366,886
kWh
Electricity Demand $73,276 10,468
kW-mo/yr
Natural Gas $58,921 22,262
MMBtu
Waste Disposal Costs
Water Usage $2,190 416
Tgal
TOTAL YEARLY COSTS $292,971
RECOMMENDED SAVINGS* $57,005 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $3,220 $14,212 $2,380
20,521
kWh
$840
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $654 $1,913 - - - $654
-
MMBtu
03 2.4322: Use or replace with energy efficient substitutes $199 $468 $199
1,721
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,254 $39,396 $8,154
70,289
kWh
$2,100
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,570 $10,263 $3,632
31,320
kWh
$938
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $19,022 $4,357 - - $19,022 -
07 2.3191: Use demand controller or load shedder $15,676 - - - $15,676 -
08 2.6231: Utilize controls to operate equipment only when needed $2,433 $1,608 - - - $2,433
-
MMBtu
09 2.6232: Install set-back timers $977 $1,306 $458
3,947
kWh
- - $519
-
MMBtu
TOTAL RECOMMENDED $57,005 $73,523 $14,823
127,798
kWh
$3,878
-
kW-mo/yr
$34,698 $3,606
-
MMBtu
TOTAL IMPLEMENTED $15,801 $50,965 $12,244
105,556
kWh
$3,038
-
kW-mo/yr
- $519
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs