ITAC Assessment: OK0955
ITAC logo
ITAC Assessment: OK0955
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Food-safe printed matter
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 146,000
ft2
Annual Production 200,000,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,265 3,036,859
kWh
Electricity Demand $73,181 10,946
kW-mo/yr
Electricity Fees $428 -
Natural Gas $10,023 2,046
MMBtu
Waste Disposal Costs
Water Usage $5,047 790
Tgal
TOTAL YEARLY COSTS $225,945
RECOMMENDED SAVINGS* $29,798 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,063

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $6,635 $15,400 - - $6,635 -
02 2.7241: Install outside air damper / economizer on hvac unit $5,478 $10,800 $5,478
121,736
kWh
- - -
03 2.7211: Clean and maintain refrigerant condensers and towers $598 $220 $445
9,886
kWh
$153
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $2,925 $572 $2,925
65,000
kWh
- - -
05 2.2437: Recover waste heat from equipment $1,259 $5,448 - - - $1,259
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,112 $1,100 $1,112
24,700
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $580 $2,140 $465
10,340
kWh
$115
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $8,841 $4,680 $8,841
196,461
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,370 $11,297 $2,370
52,660
kWh
- - -
TOTAL RECOMMENDED $29,798 $51,657 $21,636
480,783
kWh
$268
-
kW-mo/yr
$6,635 $1,259
-
MMBtu
TOTAL IMPLEMENTED $13,063 $26,129 $12,795
284,322
kWh
$268
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs