Assessment Year | 1993 |
---|---|
Principal Product | PREC. AERONAUTICAL PROD. |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 42 |
Plant Area |
n/a
|
Annual Production | 40,000,000
pieces
|
Production Hrs. Annual | 2,496
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,056 | 672,626 |
kWh
|
$0.085 |
Natural Gas | $221 | 4 |
MMBtu
|
$55.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,023 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,195 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,343 | $1,000 |
$1,343
15,826
kWh
|
- | |
02 | 2.4314: Use synthetic lubricant | $1,566 | - |
$542
6,448
kWh
|
$1,024 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $592 | $100 |
$592
7,034
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $183 | $550 |
$183
2,052
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $511 | - |
$511
6,155
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $306 | $198 |
$333
3,810
kWh
|
$(-27.0) | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,718 | $94 |
$1,823
21,395
kWh
|
$(-105.0) | |
08 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $7,058 | $5,250 |
$7,058
83,236
kWh
|
- | |
09 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $746 | $1,300 |
$746
8,792
kWh
|
- | |
TOTAL RECOMMENDED | $14,023 | $8,492 |
$13,131
154,748
kWh
|
$892 | ||
TOTAL IMPLEMENTED | $4,195 | $1,650 |
$3,171
37,515
kWh
|
$1,024 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs