ITAC Assessment: AS0083
ITAC logo
ITAC Assessment: AS0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PREC. AERONAUTICAL PROD.
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 42
Plant Area
n/a
Annual Production 40,000,000
pieces
Production Hrs. Annual 2,496
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,056 672,626
kWh
Natural Gas $221 4
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,023 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,195

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,343 $1,000 $1,343
15,826
kWh
-
02 2.4314: Use synthetic lubricant $1,566 - $542
6,448
kWh
$1,024
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $592 $100 $592
7,034
kWh
-
04 2.4133: Use most efficient type of electric motors $183 $550 $183
2,052
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $511 - $511
6,155
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $306 $198 $333
3,810
kWh
$(-27.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,718 $94 $1,823
21,395
kWh
$(-105.0)
08 2.2614: Use cooling tower or economizer to replace chiller cooling $7,058 $5,250 $7,058
83,236
kWh
-
09 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $746 $1,300 $746
8,792
kWh
-
TOTAL RECOMMENDED $14,023 $8,492 $13,131
154,748
kWh
$892
TOTAL IMPLEMENTED $4,195 $1,650 $3,171
37,515
kWh
$1,024
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs