Assessment Year | 1986 |
---|---|
Principal Product | WHEAT FLOUR & BRAN |
NAICS |
n/a
|
SIC | 2041: Flour and Other Grain Mill Products |
Sales Range | $10 M to 50M |
# of Employees | 23 |
Plant Area |
n/a
|
Annual Production | 141,200
ton
|
Production Hrs. Annual | 8,472
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $377,376 | 7,613,130 |
kWh
|
$0.050 |
Natural Gas | $28,701 | 5,992 |
MMBtu
|
$4.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,616 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,810 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $27,672 | $75,000 |
$27,672
701,641
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $13,585 | $13,500 |
$13,585
274,326
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,255 | $20 |
$2,255
45,428
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,044 | $200 |
$1,044
21,102
kWh
|
- | |
05 | 2.4312: Improve lubrication practices | $17,594 | - |
$17,594
355,217
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,883 | $500 |
$1,883
38,101
kWh
|
- | |
07 | 2.2437: Recover waste heat from equipment | $4,157 | $5,000 |
$(-998.0)
(-20,223)
kWh
|
$5,155
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,426 | $32,254 |
$12,426
250,879
kWh
|
- | |
TOTAL RECOMMENDED | $80,616 | $126,474 |
$75,461
1,666,471
kWh
|
$5,155
-
MMBtu
|
||
TOTAL IMPLEMENTED | $31,810 | $75,520 |
$31,810
785,170
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs