ITAC Assessment: NC0431
ITAC logo
ITAC Assessment: NC0431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Automatic doors
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 118,930
ft2
Annual Production 23,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,853 2,011,200
kWh
Electricity Demand $53,221 5,009
kW-mo/yr
Electricity Fees $4,375 -
Natural Gas $12,000 1,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,909 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $9,700 $100 $6,307
-
kWh
$3,393
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,126 $45,273 $7,933
204,938
kWh
$5,751
-
kW-mo/yr
- - $(-558.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $504 $409 $309
7,986
kWh
$195
-
kW-mo/yr
- - -
04 2.7241: Install outside air damper / economizer on hvac unit $1,281 $2,625 $813
20,998
kWh
$275
-
kW-mo/yr
- - $193
05 2.2437: Recover waste heat from equipment $825 $910 - - $825
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $193 $100 $204
5,263
kWh
$109
-
kW-mo/yr
- $(-100.0) $(-20.0)
07 2.4231: Reduce the pressure of compressed air to the minimum required $280 - $183
4,719
kWh
$97
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $25,909 $49,417 $15,749
243,904
kWh
$9,820
-
kW-mo/yr
$825
-
MMBtu
$(-100.0) $(-385.0)
TOTAL IMPLEMENTED $24,628 $46,792 $14,936
222,906
kWh
$9,545
-
kW-mo/yr
$825
-
MMBtu
$(-100.0) $(-578.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs