Assessment Year | 2008 |
---|---|
Principal Product | Cosmetics |
NAICS | 325620: Toilet Preparation Manufacturing |
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $100 M to 500M |
# of Employees | 650 |
Plant Area |
446,000
ft2
|
Annual Production | 254,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,743,275 | 20,748,902 |
kWh
|
$0.084 |
Natural Gas | $378,888 | 39,339 |
MMBtu
|
$9.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $695,822 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $131,090 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $463,124 | $9,955 |
$463,124
5,512,068
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $116,005 | $24,680 |
$116,005
1,380,686
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $93,199 | $40,662 |
$93,199
1,109,244
kWh
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $12,169 | $2,120 |
$12,169
144,829
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $4,739 | $3,400 |
$1,482
17,636
kWh
|
$3,257
-
MMBtu
|
- | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $3,670 | $3,894 |
$3,670
43,680
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,916 | $1,750 |
$1,398
16,644
kWh
|
- | $1,518 | |
TOTAL RECOMMENDED | $695,822 | $86,461 |
$691,047
8,224,787
kWh
|
$3,257
-
MMBtu
|
$1,518 | ||
TOTAL IMPLEMENTED | $131,090 | $28,550 |
$129,572
1,542,159
kWh
|
- | $1,518 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs