ITAC Assessment: OK0950
ITAC logo
ITAC Assessment: OK0950
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product steel and nickel alloy pipe and tube
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area 500,000
ft2
Annual Production 9,100
thousand feet
Production Hrs. Annual 7,272
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,037 4,334,826
kWh
Electricity Demand $39,650 10,415
kW-mo/yr
Electricity Fees $11,602 -
Natural Gas $159,105 31,472
MMBtu
TOTAL YEARLY COSTS $476,395
RECOMMENDED SAVINGS* $80,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,777 $12,727 $21,570
351,311
kWh
$2,207
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $22,408 $2,125 $3,332
54,249
kWh
- - $19,076
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $20,070 $1,790 $20,070
326,875
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $1,968 $666 $1,968
32,350
kWh
- - -
05 2.8121: Apply for tax-free status for energy purchases $9,245 $100 - - $9,245 -
06 2.3212: Optimize plant power factor $3,100 $13,740 - - $3,100 -
TOTAL RECOMMENDED $80,568 $31,148 $46,940
764,785
kWh
$2,207
-
kW-mo/yr
$12,345 $19,076
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs