Assessment Year | 1997 |
---|---|
Principal Product | Painting and decorating plastic injected molds parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
60,000
ft2
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 4,312
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $84,280 | 1,145,076 |
kWh
|
$0.074 |
Electricity Demand | $24,623 | 3,112 |
kW-mo/yr
|
$7.91 |
Natural Gas | $45,648 | 8,529 |
MMBtu
|
$5.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $647,438 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $60,660 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $8,920 | $15,000 | - | - |
$8,920
-
MMBtu
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,564 | $350 |
$1,217
16,413
kWh
|
$347
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,715 | $11,208 |
$8,319
112,544
kWh
|
$2,396
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7144: Install spectral reflectors / delamp | $4,501 | $3,940 |
$3,381
45,721
kWh
|
$1,120
-
kW-mo/yr
|
- | - | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,200 | $9,000 | - | - | - | - | - | $6,200 | |
06 | 3.5311: Recover and reuse waste material | $2,550 | - | - | - | - | - | - | $2,550 | |
07 | 3.8224: Convert to less toxic hydrocarbon cleaners | $10,940 | - | - | - | - |
$10,940
-
gal
|
- | - | |
08 | 3.7134: Wash and reuse rags on-site | $11,710 | $1,000 | - | - | - | - |
$11,710
-
lb
|
- | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $14,500 | $5,000 | - | - | - | - | - | $14,500 | |
10 | 4.421: Modify current incentive program | $575,838 | $120,000 | - | - | - | - | - | $575,838 | |
TOTAL RECOMMENDED | $647,438 | $165,498 |
$12,917
174,678
kWh
|
$3,863
-
kW-mo/yr
|
$8,920
-
MMBtu
|
$10,940
-
gal
|
$11,710
-
lb
|
$599,088 | ||
TOTAL IMPLEMENTED | $60,660 | $45,498 |
$12,917
174,678
kWh
|
$3,863
-
kW-mo/yr
|
$8,920
-
MMBtu
|
- |
$11,710
-
lb
|
$23,250 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs