Assessment Year | 2016 |
---|---|
Principal Product | Solid rubber tires/wheel assemblies |
NAICS | 326211: Tire Manufacturing (except Retreading) |
SIC | 3011: Tires and Inner Tubes |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
300,000
ft2
|
Annual Production | 7,000,000
lb
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $257,603 | 3,416,842 |
kWh
|
$0.075 |
Natural Gas | $110,658 | 30,961 |
MMBtu
|
$3.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,768 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,364 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,811 | $17,000 | - | - |
$7,811
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $1,586 | $7,700 | - | - |
$1,586
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,231 | $2,782 |
$1,231
16,416
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,330 | $17,442 |
$4,330
57,738
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,509 | $14,500 |
$5,509
73,452
kWh
|
- | - | |
06 | 2.6232: Install set-back timers | $1,433 | $1,280 |
$1,433
19,105
kWh
|
- | - | |
07 | 2.4322: Use or replace with energy efficient substitutes | $2,268 | $4,752 |
$2,268
30,240
kWh
|
- | - | |
08 | 2.3212: Optimize plant power factor | $5,900 | $38,500 | - | $5,900 | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,700 | $1,000 |
$3,700
49,339
kWh
|
- | - | |
TOTAL RECOMMENDED | $33,768 | $104,956 |
$18,471
246,290
kWh
|
$5,900 |
$9,397
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,364 | $5,062 |
$6,364
84,860
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs