ITAC Assessment: OK0940
ITAC logo
ITAC Assessment: OK0940
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Solid rubber tires/wheel assemblies
NAICS 326211: Tire Manufacturing (except Retreading)
SIC 3011: Tires and Inner Tubes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 300,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 2,860
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,603 3,416,842
kWh
Natural Gas $110,658 30,961
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,364

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $7,811 $17,000 - - $7,811
-
MMBtu
02 2.2437: Recover waste heat from equipment $1,586 $7,700 - - $1,586
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,231 $2,782 $1,231
16,416
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,330 $17,442 $4,330
57,738
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,509 $14,500 $5,509
73,452
kWh
- -
06 2.6232: Install set-back timers $1,433 $1,280 $1,433
19,105
kWh
- -
07 2.4322: Use or replace with energy efficient substitutes $2,268 $4,752 $2,268
30,240
kWh
- -
08 2.3212: Optimize plant power factor $5,900 $38,500 - $5,900 -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,700 $1,000 $3,700
49,339
kWh
- -
TOTAL RECOMMENDED $33,768 $104,956 $18,471
246,290
kWh
$5,900 $9,397
-
MMBtu
TOTAL IMPLEMENTED $6,364 $5,062 $6,364
84,860
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs