| Assessment Year | 2016 |
|---|---|
| Principal Product | Fabricated metal products |
| NAICS | 332313: Plate Work Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 150 |
| Plant Area |
225,000
ft2
|
| Annual Production | 1,000
pieces
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $244,015 | 3,293,138 |
kWh
|
$0.074 |
| Natural Gas | $99,523 | 14,072 |
MMBtu
|
$7.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $84,588 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6232: Install set-back timers | $7,525 | $5,775 | - |
$7,525
-
MMBtu
|
|
| 02 | 2.6125: Keep equipment clean | $4,837 | $750 | - |
$4,837
-
MMBtu
|
|
| 03 | 2.2437: Recover waste heat from equipment | $4,052 | $1,913 | - |
$4,052
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,207 | $5,310 |
$1,207
16,310
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $765 | $3,682 |
$765
10,331
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,536 | $51,920 |
$19,536
264,000
kWh
|
- | |
| 07 | 2.4322: Use or replace with energy efficient substitutes | $35,782 | $17,000 |
$35,782
483,544
kWh
|
- | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,682 | $1,170 |
$1,682
22,729
kWh
|
- | |
| 09 | 2.2514: Cover open tanks | $8,035 | $1,510 |
$8,035
108,579
kWh
|
- | |
| 10 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,167 | $1,000 | - |
$1,167
-
MMBtu
|
|
| TOTAL RECOMMENDED | $84,588 | $90,030 |
$67,007
905,493
kWh
|
$17,581
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs