Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Packaged meats
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 492
Plant Area 300,000
ft2
Annual Production 112,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $933,761 22,232,400
kWh
Electricity Demand $751,637 41,504
kW-mo/yr
Natural Gas $721,811 166,895
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $426,172 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,686

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $32,999 $48,276 $20,742
493,854
kWh
$12,257
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,290 $20,770 $1,660
39,529
kWh
$2,630
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,485 $7,280 $1,485
35,358
kWh
- - - - -
04 2.6231: Utilize controls to operate equipment only when needed $3,259 - $1,494
35,565
kWh
$1,765
-
kW-mo/yr
- - - -
05 2.2121: Increase amount of condensate returned $24,062 $20,162 - - - - $24,062
-
Tgal
-
06 2.2414: Use waste heat from hot flue gases to preheat $2,272 $3,404 - - - $2,272
-
MMBtu
- -
07 2.2135: Repair and eliminate steam leaks $353 $240 - - - $353
-
MMBtu
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,193 $83,117 $16,193
385,545
kWh
- - - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,966 $2,400 $8,966
213,475
kWh
- - - - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,618 $10,720 $22,618
538,532
kWh
- - - - -
11 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $285,555 $1,927,657 - - $667,620 $(-382,065.1)
-
MMBtu
- -
12 3.6125: Sell combustible waste $24,120 $480 - - - - - $24,120
TOTAL RECOMMENDED $426,172 $2,124,506 $73,158
1,741,858
kWh
$16,652
-
kW-mo/yr
$667,620 $(-379,440.1)
-
MMBtu
$24,062
-
Tgal
$24,120
TOTAL IMPLEMENTED $77,686 $102,532 $34,347
817,781
kWh
$16,652
-
kW-mo/yr
- $2,625
-
MMBtu
$24,062
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs