ITAC Assessment: OK0920
ITAC logo
ITAC Assessment: OK0920
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Commercial printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2754: Commercial Printing, Gravure
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 65,000
ft2
Annual Production 50,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,169 2,194,080
kWh
Electricity Demand $45,311 6,364
kW-mo/yr
Natural Gas $42,048 8,504
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.7241: Install outside air damper / economizer on hvac unit $11,299 $3,815 $11,299
198,235
kWh
- - - -
02 2.7211: Clean and maintain refrigerant condensers and towers $2,194 - $1,939
34,024
kWh
$584
-
kW-mo/yr
- - $(-330.0)
03 2.6232: Install set-back timers $2,270 $1,550 $1,227
21,534
kWh
- - $1,042
-
MMBtu
-
04 2.7496: Install partitions to reduce size of conditioned space $820 $3,450 $820
14,381
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,796 $15,971 $3,113
54,610
kWh
$684
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,190 $5,218 $840
14,732
kWh
$350
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,921 $2,360 $2,605
45,702
kWh
$316
-
kW-mo/yr
- - -
08 2.7211: Clean and maintain refrigerant condensers and towers $1,051 - $2,131
37,389
kWh
- - - $(-1,080.0)
09 2.2614: Use cooling tower or economizer to replace chiller cooling $15,138 $18,243 $14,969
262,609
kWh
$170
-
kW-mo/yr
- - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,980 $1,500 $3,980
69,825
kWh
- - - -
11 2.3212: Optimize plant power factor $3,157 $20,000 - - $3,157 - -
12 2.8114: Change rate schedules or other changes in utility service $20,000 $65,000 - - $20,000 - -
13 2.6218: Turn off equipment when not in use $487 $476 $487
8,551
kWh
- - - -
TOTAL RECOMMENDED $68,303 $137,583 $43,410
761,592
kWh
$2,104
-
kW-mo/yr
$23,157 $1,042
-
MMBtu
$(-1,410.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs