Assessment Year | 2014 |
---|---|
Principal Product | Aluminum and steel toolboxes |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
325,000
ft2
|
Annual Production | 240,000
pieces
|
Production Hrs. Annual | 3,250
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $255,598 | 5,602,800 |
kWh
|
$0.046 |
Electricity Demand | $92,965 | 20,891 |
kW-mo/yr
|
$4.45 |
Natural Gas | $344,425 | 63,619 |
MMBtu
|
$5.41 |
LPG | $29,037 | 1,408 |
MMBtu
|
$20.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,420 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,380 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $9,580 | $770 |
$(-6,257.0)
(-137,214)
kWh
|
- | - |
$29,037
-
MMBtu
|
$(-13,200.0) | |
02 | 2.4225: Install common header on compressors | $8,687 | $4,800 |
$6,065
133,000
kWh
|
$2,622
-
kW-mo/yr
|
- | - | - | |
03 | 2.4225: Install common header on compressors | $1,460 | $1,200 |
$1,460
32,000
kWh
|
- | - | - | - | |
04 | 2.6218: Turn off equipment when not in use | $1,200 | - |
$1,200
26,400
kWh
|
- | - | - | - | |
05 | 2.7229: Air condition only space necessary | $6,400 | $1,230 | - | - |
$6,400
-
MMBtu
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,700 | - | - | - |
$4,700
-
MMBtu
|
- | - | |
07 | 2.2212: Use minimum safe oven ventilation | $30,394 | $1,000 |
$1,044
22,900
kWh
|
- |
$29,349
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $62,420 | $9,000 |
$3,512
77,086
kWh
|
$2,622
-
kW-mo/yr
|
$40,449
-
MMBtu
|
$29,037
-
MMBtu
|
$(-13,200.0) | ||
TOTAL IMPLEMENTED | $51,380 | $7,030 |
$8,309
182,300
kWh
|
$2,622
-
kW-mo/yr
|
$40,449
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs