ITAC Assessment: AM0850
ITAC logo
ITAC Assessment: AM0850
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Ventilation equipment
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 100,000
ft2
Annual Production 720,000
pieces
Production Hrs. Annual 2,593
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,102 1,340,182
kWh
Electricity Demand $59,638 6,588
kW-mo/yr
Electricity Fees $2,739 -
Natural Gas $2,262 213
MMBtu
TOTAL YEARLY COSTS $127,741
RECOMMENDED SAVINGS* $20,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,239

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $10,860 $17,420 - $10,860
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,030 $9,225 $1,640
36,100
kWh
$1,500
-
kW-mo/yr
- - $(-110.0)
03 2.7141: Lower light fixtures in high ceiling areas $2,225 $1,720 $1,120
24,650
kWh
$1,020
-
kW-mo/yr
- - $85
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,765 $70 $875
19,200
kWh
$890
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $910 $1,000 $480
10,500
kWh
$430
-
kW-mo/yr
- - -
06 2.4157: Establish a predictive maintenance program $810 $1,363 $55
1,200
kWh
$55
-
kW-mo/yr
- $700 -
07 2.8123: Pay utility bills on time $389 - - - $389 - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $285 - $150
3,310
kWh
$135
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $20,274 $30,798 $4,320
94,960
kWh
$14,890
-
kW-mo/yr
$389 $700 $(-25.0)
TOTAL IMPLEMENTED $17,239 $27,715 $3,145
69,110
kWh
$13,815
-
kW-mo/yr
$389 - $(-110.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs