ITAC Assessment: OK0883
ITAC logo
ITAC Assessment: OK0883
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Plastic Wares
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 90,000
ft2
Annual Production 17,500,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,051 5,273,173
kWh
Electricity Demand $76,297 13,132
kW-mo/yr
Natural Gas $64,668 12,802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $906 $463 $906
18,129
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,972 $1,750 $1,972
39,431
kWh
- - -
03 2.7135: Install occupancy sensors $2,502 $2,480 $2,502
50,045
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $445 $2,048 $445
8,897
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $925 $1,510 $792
15,836
kWh
$133
-
kW-mo/yr
- -
06 2.7211: Clean and maintain refrigerant condensers and towers $3,030 $980 $2,333
46,656
kWh
$697
-
kW-mo/yr
- -
07 2.7261: Install timers and/or thermostats $4,226 $2,681 $2,948
58,958
kWh
- - $1,278
-
MMBtu
08 2.7231: Use radiant heater for spot heating $7,584 $15,000 - - - $7,584
-
MMBtu
09 2.3212: Optimize plant power factor $8,198 $18,876 - - $8,198 -
10 2.2437: Recover waste heat from equipment $12,481 $30,000 - - - $12,481
-
MMBtu
11 2.7142: Utilize higher efficiency lamps and/or ballasts $221 $1,083 $164
3,272
kWh
$57
-
kW-mo/yr
- -
12 2.7241: Install outside air damper / economizer on hvac unit $23,778 $19,100 $23,778
475,551
kWh
- - -
TOTAL RECOMMENDED $66,267 $95,971 $35,839
716,775
kWh
$887
-
kW-mo/yr
$8,198 $21,343
-
MMBtu
TOTAL IMPLEMENTED $3,955 $2,490 $3,125
62,492
kWh
$830
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs