ITAC Assessment: OK0880
ITAC logo
ITAC Assessment: OK0880
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Aerospace Parts Overhauling
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 223,000
ft2
Annual Production 22
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,071 2,517,600
kWh
Electricity Demand $87,865 9,276
kW-mo/yr
Natural Gas $47,089 8,433
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,983

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $706 $689 - - $706
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $302 $463 $302
6,032
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,983 $61,440 $9,165
183,298
kWh
$6,818
-
kW-mo/yr
-
04 2.7241: Install outside air damper / economizer on hvac unit $12,695 $8,800 $12,695
253,900
kWh
- -
05 2.7231: Use radiant heater for spot heating $10,569 $37,500 - - $10,569
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $227 $798 $227
4,554
kWh
- -
07 2.4131: Size electric motors for peak operating efficiency $1,087 $3,573 $1,087
21,736
kWh
- -
08 2.2511: Insulate bare equipment $6,439 $6,993 - - $6,439
-
MMBtu
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,385 $3,468 $1,385
27,697
kWh
- -
10 2.2136: Install / repair insulation on steam lines $78 $376 $29
587
kWh
- $49
-
MMBtu
TOTAL RECOMMENDED $49,471 $124,100 $24,890
497,804
kWh
$6,818
-
kW-mo/yr
$17,763
-
MMBtu
TOTAL IMPLEMENTED $15,983 $61,440 $9,165
183,298
kWh
$6,818
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings