Assessment Year | 2014 |
---|---|
Principal Product | School Buses |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
262,000
ft2
|
Annual Production | 2,500
pieces
|
Production Hrs. Annual | 2,200
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $183,363 | 3,349,606 |
kWh
|
$0.055 |
Electricity Demand | $112,446 | 10,429 |
kW-mo/yr
|
$10.78 |
Natural Gas | $97,013 | 18,251 |
MMBtu
|
$5.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,897 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,623 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $2,899 | $8,580 |
$2,899
52,710
kWh
|
- | - | |
02 | 2.4235: Remove or close off unneeded compressed air lines | $1,062 | $780 |
$1,062
19,308
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,779 | $1,750 |
$4,779
86,887
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $883 | $689 | - | - |
$883
-
MMBtu
|
|
05 | 2.7231: Use radiant heater for spot heating | $19,356 | $74,750 | - | - |
$19,356
-
MMBtu
|
|
06 | 2.7261: Install timers and/or thermostats | $2,318 | $1,148 |
$860
15,635
kWh
|
- |
$1,458
-
MMBtu
|
|
07 | 2.7135: Install occupancy sensors | $153 | $285 |
$153
2,788
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,001 | $64,468 |
$3,383
61,503
kWh
|
$3,619
-
kW-mo/yr
|
- | |
09 | 2.7135: Install occupancy sensors | $446 | - |
$446
8,104
kWh
|
- | - | |
TOTAL RECOMMENDED | $38,897 | $152,450 |
$13,582
246,935
kWh
|
$3,619
-
kW-mo/yr
|
$21,697
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,623 | $11,799 |
$8,740
158,905
kWh
|
- |
$883
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs