ITAC Assessment: OK0872
ITAC logo
ITAC Assessment: OK0872
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product School Buses
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 262,000
ft2
Annual Production 2,500
pieces
Production Hrs. Annual 2,200
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,363 3,349,606
kWh
Electricity Demand $112,446 10,429
kW-mo/yr
Natural Gas $97,013 18,251
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,897 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $2,899 $8,580 $2,899
52,710
kWh
- -
02 2.4235: Remove or close off unneeded compressed air lines $1,062 $780 $1,062
19,308
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,779 $1,750 $4,779
86,887
kWh
- -
04 2.2437: Recover waste heat from equipment $883 $689 - - $883
-
MMBtu
05 2.7231: Use radiant heater for spot heating $19,356 $74,750 - - $19,356
-
MMBtu
06 2.7261: Install timers and/or thermostats $2,318 $1,148 $860
15,635
kWh
- $1,458
-
MMBtu
07 2.7135: Install occupancy sensors $153 $285 $153
2,788
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $7,001 $64,468 $3,383
61,503
kWh
$3,619
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $446 - $446
8,104
kWh
- -
TOTAL RECOMMENDED $38,897 $152,450 $13,582
246,935
kWh
$3,619
-
kW-mo/yr
$21,697
-
MMBtu
TOTAL IMPLEMENTED $9,623 $11,799 $8,740
158,905
kWh
- $883
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs