ITAC Assessment: OK0871
ITAC logo
ITAC Assessment: OK0871
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Bearing housings
NAICS 332991: Ball and Roller Bearing Manufacturing
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 40,000
ft2
Annual Production 38,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,985 935,500
kWh
Electricity Fees $40,439 -
Natural Gas $5,182 924
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,606 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $1,092 $676 $761
10,423
kWh
$331
-
MMBtu
02 2.7211: Clean and maintain refrigerant condensers and towers $774 $280 $774
10,608
kWh
-
03 2.7232: Replace existing hvac unit with high efficiency model $2,523 $5,398 $2,523
34,560
kWh
-
04 2.6232: Install set-back timers $701 $2,100 - $701
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,148 $24,197 $6,148
84,219
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,142 $3,353 $1,142
15,643
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $507 $4,399 $507
6,945
kWh
-
08 2.4322: Use or replace with energy efficient substitutes $2,956 $4,399 $2,956
40,490
kWh
-
09 2.2437: Recover waste heat from equipment $521 $689 - $521
-
MMBtu
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,242 $500 $1,242
17,020
kWh
-
TOTAL RECOMMENDED $17,606 $45,991 $16,053
219,908
kWh
$1,553
-
MMBtu
TOTAL IMPLEMENTED $6,765 $7,955 $5,733
78,541
kWh
$1,032
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs