ITAC Assessment: OK0856
ITAC logo
ITAC Assessment: OK0856
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Polyethylene flim & PVC materials
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 85,000
ft2
Annual Production 500,000,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,406 5,791,500
kWh
Electricity Demand $89,569 12,272
kW-mo/yr
Electricity Fees $35,059 -
Natural Gas $75,882 13,792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7135: Install occupancy sensors $1,284 $1,725 $1,284
29,790
kWh
02 2.2628: Utilize a less expensive cooling method $5,800 $11,700 $5,800
134,800
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,300 $750 $1,300
30,100
kWh
04 2.4221: Install compressor air intakes in coolest locations $3,300 $550 $3,300
76,500
kWh
TOTAL RECOMMENDED $11,684 $14,725 $11,684
271,190
kWh
TOTAL IMPLEMENTED $1,300 $750 $1,300
30,100
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs