Assessment Year | 1988 |
---|---|
Principal Product | FABRICATED STEEL PRODUCTS |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
n/a
|
Annual Production | 14,500
ton
|
Production Hrs. Annual | 2,295
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $121,479 | 1,844,959 |
kWh
|
$0.066 |
Natural Gas | $28,018 | 5,939 |
MMBtu
|
$4.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,065 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,819 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $1,552 | $2,400 | - |
$1,552
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,299 | $800 |
$3,299
108,734
kWh
|
- | - | |
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,520 | - |
$2,520
82,943
kWh
|
- | - | |
04 | 2.6232: Install set-back timers | $1,370 | - |
$1,370
19,637
kWh
|
- | - | |
05 | 3.4115: Recover and reuse cooling water | $970 | $2,700 |
$100
3,224
kWh
|
- | $870 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $50 | $60 |
$50
879
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $69 | $5 |
$69
879
kWh
|
- | - | |
08 | 2.4312: Improve lubrication practices | $130 | - |
$130
3,810
kWh
|
- | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $105 | - |
$105
3,517
kWh
|
- | - | |
TOTAL RECOMMENDED | $10,065 | $5,965 |
$7,643
223,623
kWh
|
$1,552
-
MMBtu
|
$870 | ||
TOTAL IMPLEMENTED | $5,819 | $800 |
$5,819
191,677
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs