ITAC Assessment: OK0851
ITAC logo
ITAC Assessment: OK0851
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Polishing metals and metal products
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area 85,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,006 1,402,000
kWh
Electricity Demand $34,687 4,763
kW-mo/yr
Natural Gas $11,026 1,315
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,033 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $3,442 - - - - $3,442
02 2.3212: Optimize plant power factor $6,232 $14,940 - - $6,232 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,912 $6,000 $8,541
193,085
kWh
$3,371
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $647 $1,132 $647
15,089
kWh
- - -
05 2.4226: Use / purchase optimum sized compressor $7,400 $44,200 $2,945
70,000
kWh
$4,455
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,400 $1,900 $2,400
55,800
kWh
- - -
TOTAL RECOMMENDED $32,033 $68,172 $14,533
333,974
kWh
$7,826
-
kW-mo/yr
$6,232 $3,442
TOTAL IMPLEMENTED $9,800 $46,100 $5,345
125,800
kWh
$4,455
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs