Assessment Year | 2013 |
---|---|
Principal Product | Poultry |
NAICS | 311615: Poultry Processing |
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $50 M to 100M |
# of Employees | 320 |
Plant Area |
135,000
ft2
|
Annual Production | 65,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $645,386 | 14,312,052 |
kWh
|
$0.045 |
Electricity Demand | $410,573 | 31,090 |
kW-mo/yr
|
$13.21 |
Natural Gas | $518,124 | 113,752 |
MMBtu
|
$4.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $122,481 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,600 | $4,755 |
$1,124
25,880
kWh
|
$476
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,965 | $6,565 |
$1,330
29,490
kWh
|
$635
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,052 | $6,875 |
$2,101
46,575
kWh
|
$951
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,939 | $5,800 |
$1,305
28,943
kWh
|
$634
-
kW-mo/yr
|
- | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $30,500 | $24,400 | - | - |
$30,500
-
MMBtu
|
- | - | |
06 | 2.1231: Establish burner maintenance schedule for boilers | $1,100 | $1,850 | - | - |
$1,100
-
MMBtu
|
- | - | |
07 | 2.1241: Reduce excessive boiler blowdown | $18,700 | $29,260 | - | - |
$8,100
-
MMBtu
|
$4,000
-
Tgal
|
$6,600
-
gal
|
|
08 | 2.1231: Establish burner maintenance schedule for boilers | $9,409 | $18,800 |
$6,741
149,485
kWh
|
$2,668
-
kW-mo/yr
|
- | - | - | |
09 | 2.4224: Upgrade controls on compressors | $26,916 | $53,800 |
$20,800
461,200
kWh
|
$6,116
-
kW-mo/yr
|
- | - | - | |
10 | 2.1241: Reduce excessive boiler blowdown | $27,300 | $18,000 | - | - |
$27,300
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $122,481 | $170,105 |
$33,401
741,573
kWh
|
$11,480
-
kW-mo/yr
|
$67,000
-
MMBtu
|
$4,000
-
Tgal
|
$6,600
-
gal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs