ITAC Assessment: OK0849
ITAC logo
ITAC Assessment: OK0849
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Poultry
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $50
M
to 100
M
# of Employees 320
Plant Area 135,000
ft2
Annual Production 65,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $645,386 14,312,052
kWh
Electricity Demand $410,573 31,090
kW-mo/yr
Natural Gas $518,124 113,752
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $122,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,600 $4,755 $1,124
25,880
kWh
$476
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,965 $6,565 $1,330
29,490
kWh
$635
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,052 $6,875 $2,101
46,575
kWh
$951
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,939 $5,800 $1,305
28,943
kWh
$634
-
kW-mo/yr
- - -
05 2.2136: Install / repair insulation on steam lines $30,500 $24,400 - - $30,500
-
MMBtu
- -
06 2.1231: Establish burner maintenance schedule for boilers $1,100 $1,850 - - $1,100
-
MMBtu
- -
07 2.1241: Reduce excessive boiler blowdown $18,700 $29,260 - - $8,100
-
MMBtu
$4,000
-
Tgal
$6,600
-
gal
08 2.1231: Establish burner maintenance schedule for boilers $9,409 $18,800 $6,741
149,485
kWh
$2,668
-
kW-mo/yr
- - -
09 2.4224: Upgrade controls on compressors $26,916 $53,800 $20,800
461,200
kWh
$6,116
-
kW-mo/yr
- - -
10 2.1241: Reduce excessive boiler blowdown $27,300 $18,000 - - $27,300
-
MMBtu
- -
TOTAL RECOMMENDED $122,481 $170,105 $33,401
741,573
kWh
$11,480
-
kW-mo/yr
$67,000
-
MMBtu
$4,000
-
Tgal
$6,600
-
gal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs