ITAC Assessment: NC0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product recycled paper products
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area 250,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,681,194 61,061,782
kWh
Electricity Demand $1,455,043 98,402
kW-mo/yr
Electricity Fees $(-188,269.0) -
Natural Gas $1,899,050 308,413
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $261,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $174,307

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $149,890 $50,000 - - $149,890
-
MMBtu
- - -
02 3.4113: Treat and reuse rinse waters $71,629 $300,000 $(-18,494.0)
(-671,794)
kWh
$(-14,077.0)
-
kW-mo/yr
- $109,200
-
Tgal
- $(-5,000.0)
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $15,758 $45,000 $(-3,859.0)
(-140,160)
kWh
$(-2,883.0)
-
kW-mo/yr
- - $24,500
-
lb
$(-2,000.0)
04 2.1133: Adjust burners for efficient operation $16,620 $1,000 - - $16,620
-
MMBtu
- - -
05 2.4226: Use / purchase optimum sized compressor $4,551 - $4,551
179,040
kWh
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,246 $2,400 $1,840
66,829
kWh
$1,406
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $261,694 $398,400 $(-15,962.0)
(-566,085)
kWh
$(-15,554.0)
-
kW-mo/yr
$166,510
-
MMBtu
$109,200
-
Tgal
$24,500
-
lb
$(-7,000.0)
TOTAL IMPLEMENTED $174,307 $53,400 $6,391
245,869
kWh
$1,406
-
kW-mo/yr
$166,510
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs