Assessment Year | 2013 |
---|---|
Principal Product | Aircraft Parts |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 206 |
Plant Area |
213,220
ft2
|
Annual Production | 100,000,000
pieces
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $319,909 | 10,328,149 |
kWh
|
$0.031 |
Electricity Demand | $227,339 | 23,567 |
kW-mo/yr
|
$9.65 |
Natural Gas | $49,415 | 8,658 |
MMBtu
|
$5.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,488 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,051 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,801 | $9,541 |
$1,249
40,284
kWh
|
$1,552
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,561 | $525 |
$1,561
50,355
kWh
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $1,618 | $31,000 |
$1,618
52,180
kWh
|
- | - | - | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $7,018 | $8,775 |
$7,018
226,375
kWh
|
- | - | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $2,467 | $13,650 |
$1,491
48,086
kWh
|
$976
-
kW-mo/yr
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $5,061 | $3,840 |
$1,285
41,457
kWh
|
$1,206
-
kW-mo/yr
|
- |
$2,570
-
MMBtu
|
|
07 | 2.3212: Optimize plant power factor | $32,267 | $17,174 | - | - | $32,267 | - | |
08 | 2.2136: Install / repair insulation on steam lines | $2,202 | $862 | - | - | - |
$2,202
-
MMBtu
|
|
09 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $493 | $413 |
$493
15,894
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $55,488 | $85,780 |
$14,715
474,631
kWh
|
$3,735
-
kW-mo/yr
|
$32,267 |
$4,772
-
MMBtu
|
||
TOTAL IMPLEMENTED | $44,051 | $36,464 |
$4,830
155,792
kWh
|
$2,183
-
kW-mo/yr
|
$32,267 |
$4,772
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs