ITAC Assessment: IP0045
ITAC logo
ITAC Assessment: IP0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Tube Cutoff Machines
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 13
Plant Area 47,000
ft2
Annual Production 10
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,940 204,792
kWh
Electricity Demand $14,050 1,014
kW-mo/yr
Electricity Fees $2,268 -
LPG $34,978 1,314
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,231 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,231

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings
01 4.812: Apply for investment incentives $1,605 - - - $1,605 - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $401 - $171
3,227
kWh
$230
-
kW-mo/yr
- - -
03 2.1331: Burn a less expensive grade of fuel $25,783 $1,054 - - - $(-9,195.0)
-
MMBtu
$34,978
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,242 $417 $530
10,006
kWh
$711
-
kW-mo/yr
- - -
05 2.7243: Improve air circulation with destratification fans / other methods $4,201 $17,250 - - - - $4,201
-
MMBtu
TOTAL RECOMMENDED $33,231 $18,721 $701
13,233
kWh
$941
-
kW-mo/yr
$1,605 $(-9,195.0)
-
MMBtu
$39,179
-
MMBtu
TOTAL IMPLEMENTED $33,231 $18,721 $701
13,233
kWh
$941
-
kW-mo/yr
$1,605 $(-9,195.0)
-
MMBtu
$39,179
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs