| Assessment Year | 2015 |
|---|---|
| Principal Product | Tube Cutoff Machines |
| NAICS | 333249: Other Industrial Machinery Manufacturing |
| SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 13 |
| Plant Area |
47,000
ft2
|
| Annual Production | 10
pieces
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $10,940 | 204,792 |
kWh
|
$0.053 |
| Electricity Demand | $14,050 | 1,014 |
kW-mo/yr
|
$13.86 |
| Electricity Fees | $2,268 | - |
|
- |
| LPG | $34,978 | 1,314 |
MMBtu
|
$26.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $33,231 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $33,231 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.812: Apply for investment incentives | $1,605 | - | - | - | $1,605 | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $401 | - |
$171
3,227
kWh
|
$230
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.1331: Burn a less expensive grade of fuel | $25,783 | $1,054 | - | - | - |
$(-9,195.0)
-
MMBtu
|
$34,978
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,242 | $417 |
$530
10,006
kWh
|
$711
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $4,201 | $17,250 | - | - | - | - |
$4,201
-
MMBtu
|
|
| TOTAL RECOMMENDED | $33,231 | $18,721 |
$701
13,233
kWh
|
$941
-
kW-mo/yr
|
$1,605 |
$(-9,195.0)
-
MMBtu
|
$39,179
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $33,231 | $18,721 |
$701
13,233
kWh
|
$941
-
kW-mo/yr
|
$1,605 |
$(-9,195.0)
-
MMBtu
|
$39,179
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs