Assessment Year | 2013 |
---|---|
Principal Product | Pipe fittings |
NAICS | 332996: Fabricated Pipe and Pipe Fitting Manufacturing |
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
261,000
ft2
|
Annual Production | 1,400,000
pieces
|
Production Hrs. Annual | 4,480
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $246,880 | 6,060,000 |
kWh
|
$0.041 |
Electricity Demand | $134,994 | 20,795 |
kW-mo/yr
|
$6.49 |
Electricity Fees | $55,021 | - |
|
- |
Natural Gas | $118,652 | 22,627 |
MMBtu
|
$5.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,375 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,922 | $21,000 |
$4,922
120,941
kWh
|
- | - | |
02 | 2.3212: Optimize plant power factor | $6,000 | $32,130 | - |
$6,000
-
kW-mo/yr
|
- | |
03 | 2.4131: Size electric motors for peak operating efficiency | $11,299 | $76,750 |
$9,942
235,550
kWh
|
- |
$1,357
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,154 | $4,200 |
$5,154
125,700
kWh
|
- | - | |
05 | 2.4131: Size electric motors for peak operating efficiency | $6,800 | $18,500 |
$6,800
168,100
kWh
|
- | - | |
TOTAL RECOMMENDED | $34,175 | $152,580 |
$26,818
650,291
kWh
|
$6,000
-
kW-mo/yr
|
$1,357
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,375 | $101,950 |
$20,018
482,191
kWh
|
- |
$1,357
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs