ITAC Assessment: OK0844
ITAC logo
ITAC Assessment: OK0844
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Pipe fittings
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 261,000
ft2
Annual Production 1,400,000
pieces
Production Hrs. Annual 4,480
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $246,880 6,060,000
kWh
Electricity Demand $134,994 20,795
kW-mo/yr
Electricity Fees $55,021 -
Natural Gas $118,652 22,627
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,375

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,922 $21,000 $4,922
120,941
kWh
- -
02 2.3212: Optimize plant power factor $6,000 $32,130 - $6,000
-
kW-mo/yr
-
03 2.4131: Size electric motors for peak operating efficiency $11,299 $76,750 $9,942
235,550
kWh
- $1,357
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,154 $4,200 $5,154
125,700
kWh
- -
05 2.4131: Size electric motors for peak operating efficiency $6,800 $18,500 $6,800
168,100
kWh
- -
TOTAL RECOMMENDED $34,175 $152,580 $26,818
650,291
kWh
$6,000
-
kW-mo/yr
$1,357
-
MMBtu
TOTAL IMPLEMENTED $21,375 $101,950 $20,018
482,191
kWh
- $1,357
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs