Assessment Year | 2009 |
---|---|
Principal Product | Industrail hose |
NAICS | 326220: Rubber and Plastics Hoses and Belting Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
280,000
ft2
|
Annual Production | 22,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $660,798 | 20,085,793 |
kWh
|
$0.033 |
Electricity Demand | $248,414 | 34,464 |
kW-mo/yr
|
$7.21 |
Natural Gas | $533,422 | 64,514 |
MMBtu
|
$8.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $120,860 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,812 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,701 | $680 |
$1,901
58,454
kWh
|
$800
-
kW-mo/yr
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,759 | $17,051 |
$4,966
152,851
kWh
|
$2,793
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,444 | $702 |
$1,720
52,177
kWh
|
$724
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,935 | $825 |
$1,436
44,177
kWh
|
$499
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,456 | $650 |
$4,456
137,098
kWh
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $7,420 | $1,820 |
$7,420
222,898
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $853 | $479 |
$853
26,243
kWh
|
- | - | |
08 | 2.2136: Install / repair insulation on steam lines | $2,129 | $760 | - | - |
$2,129
-
MMBtu
|
|
09 | 2.1113: Reduce combustion air flow to optimum | $49,777 | $70,000 | - | - |
$49,777
-
MMBtu
|
|
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $25,097 | $27,000 |
$25,097
772,208
kWh
|
- | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,289 | $16,600 |
$16,289
501,209
kWh
|
- | - | |
TOTAL RECOMMENDED | $120,860 | $136,567 |
$64,138
1,967,315
kWh
|
$4,816
-
kW-mo/yr
|
$51,906
-
MMBtu
|
||
TOTAL IMPLEMENTED | $46,812 | $45,541 |
$43,959
1,351,837
kWh
|
$724
-
kW-mo/yr
|
$2,129
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs