Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Industrail hose
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 280,000
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $660,798 20,085,793
kWh
Electricity Demand $248,414 34,464
kW-mo/yr
Natural Gas $533,422 64,514
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,701 $680 $1,901
58,454
kWh
$800
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,759 $17,051 $4,966
152,851
kWh
$2,793
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,444 $702 $1,720
52,177
kWh
$724
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,935 $825 $1,436
44,177
kWh
$499
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,456 $650 $4,456
137,098
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $7,420 $1,820 $7,420
222,898
kWh
- -
07 2.7135: Install occupancy sensors $853 $479 $853
26,243
kWh
- -
08 2.2136: Install / repair insulation on steam lines $2,129 $760 - - $2,129
-
MMBtu
09 2.1113: Reduce combustion air flow to optimum $49,777 $70,000 - - $49,777
-
MMBtu
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,097 $27,000 $25,097
772,208
kWh
- -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,289 $16,600 $16,289
501,209
kWh
- -
TOTAL RECOMMENDED $120,860 $136,567 $64,138
1,967,315
kWh
$4,816
-
kW-mo/yr
$51,906
-
MMBtu
TOTAL IMPLEMENTED $46,812 $45,541 $43,959
1,351,837
kWh
$724
-
kW-mo/yr
$2,129
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs