Assessment Year | 1999 |
---|---|
Principal Product | Frozen concentrated orange and grapefruit juice |
NAICS |
n/a
|
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
350,000
ft2
|
Annual Production | 3,875
Tgal
|
Production Hrs. Annual | 3,384
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $198,810 | 5,431,419 |
kWh
|
$0.037 |
Electricity Demand | $27,481 | 15,351 |
kW-mo/yr
|
$1.79 |
Fuel Oil #6 | $308,826 | 102,260 |
MMBtu
|
$3.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,159 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,576 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $50,699 | $251,200 |
$4,149
112,251
kWh
|
$550
-
kW-mo/yr
|
- | - | $46,000 | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,441 | - | - |
$4,421
-
kW-mo/yr
|
$7,020 | - | - | |
03 | 2.1231: Establish burner maintenance schedule for boilers | $6,211 | - | - | - | - |
$7,411
-
MMBtu
|
$(-1,200.0) | |
04 | 3.5311: Recover and reuse waste material | $11,243 | $1,800 | - | - | - | - | $11,243 | |
05 | 4.652: Replace existing equipment with more suitable substitutes | $5,200 | - | - | - | - | - | $5,200 | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,365 | - |
$1,796
64,771
kWh
|
- | - | - | $569 | |
TOTAL RECOMMENDED | $87,159 | $253,000 |
$5,945
177,022
kWh
|
$4,971
-
kW-mo/yr
|
$7,020 |
$7,411
-
MMBtu
|
$61,812 | ||
TOTAL IMPLEMENTED | $8,576 | - |
$1,796
64,771
kWh
|
- | - |
$7,411
-
MMBtu
|
$(-631.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs