ITAC Assessment: UF0216
ITAC logo
ITAC Assessment: UF0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Frozen concentrated orange and grapefruit juice
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 350,000
ft2
Annual Production 3,875
Tgal
Production Hrs. Annual 3,384
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,810 5,431,419
kWh
Electricity Demand $27,481 15,351
kW-mo/yr
Fuel Oil #6 $308,826 102,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,576

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.2622: Replace existing chiller with high efficiency model $50,699 $251,200 $4,149
112,251
kWh
$550
-
kW-mo/yr
- - $46,000
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,441 - - $4,421
-
kW-mo/yr
$7,020 - -
03 2.1231: Establish burner maintenance schedule for boilers $6,211 - - - - $7,411
-
MMBtu
$(-1,200.0)
04 3.5311: Recover and reuse waste material $11,243 $1,800 - - - - $11,243
05 4.652: Replace existing equipment with more suitable substitutes $5,200 - - - - - $5,200
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,365 - $1,796
64,771
kWh
- - - $569
TOTAL RECOMMENDED $87,159 $253,000 $5,945
177,022
kWh
$4,971
-
kW-mo/yr
$7,020 $7,411
-
MMBtu
$61,812
TOTAL IMPLEMENTED $8,576 - $1,796
64,771
kWh
- - $7,411
-
MMBtu
$(-631.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs