Assessment Year | 2013 |
---|---|
Principal Product | HVAC components |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | greater than $500 M |
# of Employees | 1,000 |
Plant Area |
2,250,000
ft2
|
Annual Production | 10,000,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,092,559 | 27,468,097 |
kWh
|
$0.076 |
Electricity Demand | $675,658 | 65,218 |
kW-mo/yr
|
$10.36 |
Natural Gas | $299,258 | 38,608 |
MMBtu
|
$7.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $494,391 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $91,444 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7226: Use computer programs to optimize hvac performance | $21,170 | $53,000 |
$4,461
58,693
kWh
|
- |
$16,709
-
MMBtu
|
- | |
02 | 2.7231: Use radiant heater for spot heating | $52,275 | $107,250 | - | - |
$52,275
-
MMBtu
|
- | |
03 | 2.7211: Clean and maintain refrigerant condensers and towers | $52,815 | $21,105 |
$36,540
480,787
kWh
|
$16,276
-
kW-mo/yr
|
- | - | |
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $7,057 | $128,411 |
$2,229
29,330
kWh
|
- |
$4,828
-
MMBtu
|
- | |
05 | 2.2628: Utilize a less expensive cooling method | $242,685 | $1,298,400 |
$204,498
2,690,765
kWh
|
$38,187
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $664 | $5,625 |
$664
8,733
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,837 | $5,254 |
$5,837
60,777
kWh
|
- | - | - | |
08 | 2.4322: Use or replace with energy efficient substitutes | $8,801 | $21,780 |
$8,801
115,801
kWh
|
- | - | - | |
09 | 2.2437: Recover waste heat from equipment | $24,000 | $1,708 | - | - |
$24,000
-
MMBtu
|
- | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $22,770 | $5,000 |
$22,770
299,608
kWh
|
- | - | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $5,138 | $7,536 |
$5,138
67,606
kWh
|
- | - | - | |
12 | 2.3212: Optimize plant power factor | $18,213 | $10,212 | - |
$18,213
-
kW-mo/yr
|
- | - | |
13 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $32,965 | $56,937 | - | - | - |
$32,965
-
Tgal
|
|
TOTAL RECOMMENDED | $494,391 | $1,722,218 |
$290,938
3,812,100
kWh
|
$72,676
-
kW-mo/yr
|
$97,812
-
MMBtu
|
$32,965
-
Tgal
|
||
TOTAL IMPLEMENTED | $91,444 | $176,296 |
$70,340
925,526
kWh
|
$16,276
-
kW-mo/yr
|
$4,828
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs