ITAC Assessment: OK0829
ITAC logo
ITAC Assessment: OK0829
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 525,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,869 3,878,856
kWh
Electricity Demand $24,810 15,506
kW-mo/yr
LPG $275,364 12,074
MMBtu
Fuel Oil #1 $13,713 592
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #1 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,021 $1,600 $11,021
220,430
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,959 $33,990 $4,706
94,127
kWh
$253
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $18,968 $260,400 $16,626
332,514
kWh
$2,342
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $346 $954 $346
6,923
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $202 $1,139 $186
3,717
kWh
$16
-
kW-mo/yr
- -
06 2.7241: Install outside air damper / economizer on hvac unit $5,221 $7,540 $5,221
104,417
kWh
- - -
07 2.7211: Clean and maintain refrigerant condensers and towers $2,159 $417 $2,059
41,172
kWh
$100
-
kW-mo/yr
- -
08 2.6232: Install set-back timers $3,516 $489 $3,516
70,324
kWh
- - -
09 2.7232: Replace existing hvac unit with high efficiency model $5,966 $80,748 $5,690
113,773
kWh
$276
-
kW-mo/yr
- -
10 2.7231: Use radiant heater for spot heating $8,164 $17,500 - - $(-4,574.0)
-
MMBtu
$12,738
-
MMBtu
TOTAL RECOMMENDED $60,522 $404,777 $49,371
987,397
kWh
$2,987
-
kW-mo/yr
$(-4,574.0)
-
MMBtu
$12,738
-
MMBtu
TOTAL IMPLEMENTED $13,180 $2,017 $13,080
261,602
kWh
$100
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #1 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs