Assessment Year | 2012 |
---|---|
Principal Product | Trailers |
NAICS | 336212: Truck Trailer Manufacturing |
SIC | 3715: Truck Trailers |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
525,000
ft2
|
Annual Production | 1,500
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $188,869 | 3,878,856 |
kWh
|
$0.049 |
Electricity Demand | $24,810 | 15,506 |
kW-mo/yr
|
$1.60 |
LPG | $275,364 | 12,074 |
MMBtu
|
$22.81 |
Fuel Oil #1 | $13,713 | 592 |
MMBtu
|
$23.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,522 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,180 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #1 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,021 | $1,600 |
$11,021
220,430
kWh
|
- | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,959 | $33,990 |
$4,706
94,127
kWh
|
$253
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,968 | $260,400 |
$16,626
332,514
kWh
|
$2,342
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $346 | $954 |
$346
6,923
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $202 | $1,139 |
$186
3,717
kWh
|
$16
-
kW-mo/yr
|
- | - | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $5,221 | $7,540 |
$5,221
104,417
kWh
|
- | - | - | |
07 | 2.7211: Clean and maintain refrigerant condensers and towers | $2,159 | $417 |
$2,059
41,172
kWh
|
$100
-
kW-mo/yr
|
- | - | |
08 | 2.6232: Install set-back timers | $3,516 | $489 |
$3,516
70,324
kWh
|
- | - | - | |
09 | 2.7232: Replace existing hvac unit with high efficiency model | $5,966 | $80,748 |
$5,690
113,773
kWh
|
$276
-
kW-mo/yr
|
- | - | |
10 | 2.7231: Use radiant heater for spot heating | $8,164 | $17,500 | - | - |
$(-4,574.0)
-
MMBtu
|
$12,738
-
MMBtu
|
|
TOTAL RECOMMENDED | $60,522 | $404,777 |
$49,371
987,397
kWh
|
$2,987
-
kW-mo/yr
|
$(-4,574.0)
-
MMBtu
|
$12,738
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,180 | $2,017 |
$13,080
261,602
kWh
|
$100
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #1 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs