ITAC Assessment: MUCM06
ITAC logo
ITAC Assessment: MUCM06
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Automotive Parts Testing
NAICS 541380: Testing Laboratories
SIC 8734: Testing Laboratories
Sales Range less than $500
k
# of Employees 750
Plant Area 250,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $473,303 8,046,360
kWh
Electricity Demand $90,094 21,400
kW-mo/yr
Electricity Fees $67,959 -
Natural Gas $70,939 9,065
MMBtu
TOTAL YEARLY COSTS $702,295
RECOMMENDED SAVINGS* $50,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $419 $742 - - $419
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $8,378 - $8,378
139,460
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $343 $934 $313
5,212
kWh
$30
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,458 $12,451 $4,458
74,300
kWh
- -
05 2.6211: Conserve energy by efficient use of vending machines $981 $900 $981
16,355
kWh
- -
06 2.6218: Turn off equipment when not in use $281 - $281
4,680
kWh
- -
07 2.1212: Operate boilers on high fire setting $1,703 $450 - - $1,703
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,882 $7,450 $1,715
28,579
kWh
$167
-
kW-mo/yr
-
09 2.7224: Reduce space conditioning during non-working hours $20,603 $58,440 $12,727
212,116
kWh
$447
-
kW-mo/yr
$7,429
-
MMBtu
10 2.7447: Install vinyl strip / high speed / air curtain doors $537 $2,500 $490
8,168
kWh
$47
-
kW-mo/yr
-
11 2.7447: Install vinyl strip / high speed / air curtain doors $10,435 $11,466 $3,970
66,171
kWh
- $6,464
-
MMBtu
TOTAL RECOMMENDED $50,021 $95,333 $33,313
555,041
kWh
$691
-
kW-mo/yr
$16,017
-
MMBtu
TOTAL IMPLEMENTED $9,421 $1,676 $8,972
149,353
kWh
$30
-
kW-mo/yr
$419
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs