Assessment Year | 2022 |
---|---|
Principal Product | Automotive Parts Testing |
NAICS | 541380: Testing Laboratories |
SIC | 8734: Testing Laboratories |
Sales Range | less than $500 k |
# of Employees | 750 |
Plant Area |
250,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $473,303 | 8,046,360 |
kWh
|
$0.059 |
Electricity Demand | $90,094 | 21,400 |
kW-mo/yr
|
$4.21 |
Electricity Fees | $67,959 | - |
|
- |
Natural Gas | $70,939 | 9,065 |
MMBtu
|
$7.83 |
TOTAL YEARLY COSTS | $702,295 | |||
RECOMMENDED SAVINGS* | $50,021 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,421 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $419 | $742 | - | - |
$419
-
MMBtu
|
|
02 | 2.7111: Reduce illumination to minimum necessary levels | $8,378 | - |
$8,378
139,460
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $343 | $934 |
$313
5,212
kWh
|
$30
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,458 | $12,451 |
$4,458
74,300
kWh
|
- | - | |
05 | 2.6211: Conserve energy by efficient use of vending machines | $981 | $900 |
$981
16,355
kWh
|
- | - | |
06 | 2.6218: Turn off equipment when not in use | $281 | - |
$281
4,680
kWh
|
- | - | |
07 | 2.1212: Operate boilers on high fire setting | $1,703 | $450 | - | - |
$1,703
-
MMBtu
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,882 | $7,450 |
$1,715
28,579
kWh
|
$167
-
kW-mo/yr
|
- | |
09 | 2.7224: Reduce space conditioning during non-working hours | $20,603 | $58,440 |
$12,727
212,116
kWh
|
$447
-
kW-mo/yr
|
$7,429
-
MMBtu
|
|
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $537 | $2,500 |
$490
8,168
kWh
|
$47
-
kW-mo/yr
|
- | |
11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $10,435 | $11,466 |
$3,970
66,171
kWh
|
- |
$6,464
-
MMBtu
|
|
TOTAL RECOMMENDED | $50,021 | $95,333 |
$33,313
555,041
kWh
|
$691
-
kW-mo/yr
|
$16,017
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,421 | $1,676 |
$8,972
149,353
kWh
|
$30
-
kW-mo/yr
|
$419
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs