Assessment Year | 2012 |
---|---|
Principal Product | Electromechanical assemlies and machine parts |
NAICS | 333517: Machine Tool Manufacturing |
SIC | 3541: Machine Tools, Metal Cutting Types |
Sales Range | $10 M to 50M |
# of Employees | 118 |
Plant Area |
100,000
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 4,576
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $144,003 | 1,207,260 |
kWh
|
$0.12 |
Electricity Demand | $29,041 | 3,275 |
kW-mo/yr
|
$8.87 |
Electricity Fees | $767 | - |
|
- |
Natural Gas | $35,513 | 3,159 |
MMBtu
|
$11.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,471 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,382 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,860 | $86,160 |
$11,620
97,646
kWh
|
$240
-
kW-mo/yr
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,626 | $19,725 |
$8,626
72,486
kWh
|
- | |
03 | 2.6218: Turn off equipment when not in use | $5,501 | $1,000 |
$5,501
46,228
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,463 | $11,880 |
$2,428
20,404
kWh
|
$35
-
kW-mo/yr
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,021 | $1,800 |
$2,021
16,983
kWh
|
- | |
TOTAL RECOMMENDED | $30,471 | $120,565 |
$30,196
253,747
kWh
|
$275
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $19,382 | $88,960 |
$19,142
160,857
kWh
|
$240
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs