ITAC Assessment: MA0686
ITAC logo
ITAC Assessment: MA0686
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Electromechanical assemlies and machine parts
NAICS 333517: Machine Tool Manufacturing
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area 100,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 4,576
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,003 1,207,260
kWh
Electricity Demand $29,041 3,275
kW-mo/yr
Electricity Fees $767 -
Natural Gas $35,513 3,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,382

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,860 $86,160 $11,620
97,646
kWh
$240
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,626 $19,725 $8,626
72,486
kWh
-
03 2.6218: Turn off equipment when not in use $5,501 $1,000 $5,501
46,228
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,463 $11,880 $2,428
20,404
kWh
$35
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,021 $1,800 $2,021
16,983
kWh
-
TOTAL RECOMMENDED $30,471 $120,565 $30,196
253,747
kWh
$275
-
kW-mo/yr
TOTAL IMPLEMENTED $19,382 $88,960 $19,142
160,857
kWh
$240
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs