| Assessment Year | 2012 |
|---|---|
| Principal Product | Aircraft parts |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 190 |
| Plant Area |
150,000
ft2
|
| Annual Production | 37,293
pieces
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $307,612 | 6,887,640 |
kWh
|
$0.045 |
| Electricity Demand | $157,940 | 19,532 |
kW-mo/yr
|
$8.09 |
| Natural Gas | $53,437 | 7,709 |
MMBtu
|
$6.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,996 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,431 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,533 | $1,000 |
$2,533
50,658
kWh
|
- | - | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $2,407 | $1,378 | - | - |
$2,407
-
MMBtu
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,484 | - |
$1,416
28,318
kWh
|
$1,068
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,418 | $10,765 |
$826
16,516
kWh
|
$592
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $123 | $1,503 |
$74
1,474
kWh
|
$49
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $13,788 | $23,625 | - | - | - | - |
$13,788
-
Tgal
|
|
| 07 | 2.2414: Use waste heat from hot flue gases to preheat | $4,564 | $22,440 | - | - |
$4,564
-
MMBtu
|
- | - | |
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $4,021 | $17,592 | - | - |
$4,021
-
MMBtu
|
- | - | |
| 09 | 2.7241: Install outside air damper / economizer on hvac unit | $3,500 | $2,300 |
$3,500
69,684
kWh
|
- | - | - | - | |
| 10 | 2.6232: Install set-back timers | $2,711 | - | - | - |
$2,711
-
MMBtu
|
- | - | |
| 11 | 2.3212: Optimize plant power factor | $7,070 | $17,506 | - |
$7,070
-
kW-mo/yr
|
- | - | - | |
| 12 | 2.7243: Improve air circulation with destratification fans / other methods | $1,889 | $7,800 |
$(-326.0)
(-6,535)
kWh
|
$(-72.1)
-
kW-mo/yr
|
$2,287
-
MMBtu
|
- | - | |
| 13 | 2.1232: Keep boiler tubes clean | $610 | $1,100 | - | - |
$660
-
MMBtu
|
$(-50.0) | - | |
| 14 | 2.7232: Replace existing hvac unit with high efficiency model | $2,878 | $36,395 |
$2,773
55,464
kWh
|
$105
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $49,996 | $143,404 |
$10,796
215,579
kWh
|
$8,812
-
kW-mo/yr
|
$16,650
-
MMBtu
|
$(-50.0) |
$13,788
-
Tgal
|
||
| TOTAL IMPLEMENTED | $14,431 | $49,538 |
$7,548
150,956
kWh
|
$1,765
-
kW-mo/yr
|
$5,118
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs