Assessment Year | 2012 |
---|---|
Principal Product | Ferrous Castings |
NAICS | 331513: Steel Foundries (except Investment) |
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
35,470
ft2
|
Annual Production | 1,900
ton
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $239,951 | 2,490,900 |
kWh
|
$0.096 |
Natural Gas | $12,622 | 1,631 |
MMBtu
|
$7.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $338,764 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $314,679 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,728 | $10,884 |
$19,728
204,861
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,891 | $16,296 |
$1,891
19,635
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $199 | $556 |
$199
2,067
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,633 | $560 |
$2,633
27,346
kWh
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $15,206 | $29,250 |
$15,206
157,906
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,466 | - |
$2,466
25,603
kWh
|
- | - | |
07 | 2.7261: Install timers and/or thermostats | $102 | $353 | - |
$102
-
MMBtu
|
- | |
08 | 4.445: Install equipment to move product | $296,539 | $350,000 |
$12,619
131,040
kWh
|
- | $283,920 | |
TOTAL RECOMMENDED | $338,764 | $407,899 |
$54,742
568,458
kWh
|
$102
-
MMBtu
|
$283,920 | ||
TOTAL IMPLEMENTED | $314,679 | $380,719 |
$30,657
318,359
kWh
|
$102
-
MMBtu
|
$283,920 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs