ITAC Assessment: OK0819
ITAC logo
ITAC Assessment: OK0819
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Ferrous Castings
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 35,470
ft2
Annual Production 1,900
ton
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,951 2,490,900
kWh
Natural Gas $12,622 1,631
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $338,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $314,679

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,728 $10,884 $19,728
204,861
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,891 $16,296 $1,891
19,635
kWh
- -
03 2.7135: Install occupancy sensors $199 $556 $199
2,067
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,633 $560 $2,633
27,346
kWh
- -
05 2.4322: Use or replace with energy efficient substitutes $15,206 $29,250 $15,206
157,906
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,466 - $2,466
25,603
kWh
- -
07 2.7261: Install timers and/or thermostats $102 $353 - $102
-
MMBtu
-
08 4.445: Install equipment to move product $296,539 $350,000 $12,619
131,040
kWh
- $283,920
TOTAL RECOMMENDED $338,764 $407,899 $54,742
568,458
kWh
$102
-
MMBtu
$283,920
TOTAL IMPLEMENTED $314,679 $380,719 $30,657
318,359
kWh
$102
-
MMBtu
$283,920
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs