ITAC Assessment: TT0227
ITAC logo
ITAC Assessment: TT0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Medium Voltage Switchgear
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 200,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,189 4,258,000
kWh
Electricity Demand $121,684 11,184
kW-mo/yr
Natural Gas $68,637 12,155
MMBtu
Waste Disposal Costs
Water Usage $4 264
Tgal
Water Disposal $4 0
Tgal
Solid Waste (non-haz) $90,399 652,800
lb
TOTAL YEARLY COSTS $544,918
RECOMMENDED SAVINGS* $91,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $73,127 $4,450 - - - $63,279
-
lb
$(-13,000.0) - $22,848
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,143 $2,500 - $(-25,958.0)
-
kW-mo/yr
$31,101 - - - -
03 3.6192: Use a less expensive method of waste removal $4,828 $5,000 - - - $9,040
-
lb
$(-4,212.0) - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,227 $2,000 $3,299
53,213
kWh
$928
-
kW-mo/yr
- - - - -
05 2.4224: Upgrade controls on compressors $2,646 $2,000 $2,646
42,678
kWh
- - - - - -
06 2.7224: Reduce space conditioning during non-working hours $1,110 $550 $1,110
17,911
kWh
- - - - - -
07 3.6192: Use a less expensive method of waste removal $399 $750 - - - $4,520
-
lb
$(-1,300.0) $(-2,821.0) -
TOTAL RECOMMENDED $91,480 $17,250 $7,055
113,802
kWh
$(-25,030.0)
-
kW-mo/yr
$31,101 $76,839
-
lb
$(-18,512.0) $(-2,821.0) $22,848
TOTAL IMPLEMENTED $11,701 $9,000 $5,945
95,891
kWh
$928
-
kW-mo/yr
- $9,040
-
lb
$(-4,212.0) - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs