ITAC Assessment: OK0811
ITAC logo
ITAC Assessment: OK0811
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Beef patties and pork sausage
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 470
Plant Area 200,000
ft2
Annual Production 260,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,256,945 44,992,800
kWh
Natural Gas $818,414 168,106
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $446,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,696

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $127,513 $58,126 $127,513
2,550,268
kWh
- -
02 2.7241: Install outside air damper / economizer on hvac unit $17,432 $60,934 $17,432
348,648
kWh
- -
03 2.7211: Clean and maintain refrigerant condensers and towers $2,854 $2,600 $2,854
57,075
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,132 $60,156 $13,132
262,642
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,716 $11,429 $8,716
174,315
kWh
- -
06 2.7135: Install occupancy sensors $160 $944 $160
3,192
kWh
- -
07 2.2437: Recover waste heat from equipment $32,372 $270,346 - $32,372
-
MMBtu
-
08 3.4151: Minimize water usage $159,930 $46,397 - - $159,930
-
Tgal
09 2.6231: Utilize controls to operate equipment only when needed $61,620 $459 - $61,620
-
MMBtu
-
10 2.6121: Reduce hot water temperature to the minimum required $22,682 - - $22,682
-
MMBtu
-
TOTAL RECOMMENDED $446,411 $511,391 $169,807
3,396,140
kWh
$116,674
-
MMBtu
$159,930
-
Tgal
TOTAL IMPLEMENTED $25,696 $3,544 $3,014
60,267
kWh
$22,682
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs