Assessment Year | 2011 |
---|---|
Principal Product | Beef patties and pork sausage |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $100 M to 500M |
# of Employees | 470 |
Plant Area |
200,000
ft2
|
Annual Production | 260,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,256,945 | 44,992,800 |
kWh
|
$0.050 |
Natural Gas | $818,414 | 168,106 |
MMBtu
|
$4.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $446,411 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,696 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $127,513 | $58,126 |
$127,513
2,550,268
kWh
|
- | - | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $17,432 | $60,934 |
$17,432
348,648
kWh
|
- | - | |
03 | 2.7211: Clean and maintain refrigerant condensers and towers | $2,854 | $2,600 |
$2,854
57,075
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,132 | $60,156 |
$13,132
262,642
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,716 | $11,429 |
$8,716
174,315
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $160 | $944 |
$160
3,192
kWh
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $32,372 | $270,346 | - |
$32,372
-
MMBtu
|
- | |
08 | 3.4151: Minimize water usage | $159,930 | $46,397 | - | - |
$159,930
-
Tgal
|
|
09 | 2.6231: Utilize controls to operate equipment only when needed | $61,620 | $459 | - |
$61,620
-
MMBtu
|
- | |
10 | 2.6121: Reduce hot water temperature to the minimum required | $22,682 | - | - |
$22,682
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $446,411 | $511,391 |
$169,807
3,396,140
kWh
|
$116,674
-
MMBtu
|
$159,930
-
Tgal
|
||
TOTAL IMPLEMENTED | $25,696 | $3,544 |
$3,014
60,267
kWh
|
$22,682
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs