Assessment Year | 2011 |
---|---|
Principal Product | Paint |
NAICS | 325510: Paint and Coating Manufacturing |
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $100 M to 500M |
# of Employees | 220 |
Plant Area |
371,000
ft2
|
Annual Production | 51,100
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,048,812 | 12,748,800 |
kWh
|
$0.082 |
Electricity Demand | $179,301 | 24,864 |
kW-mo/yr
|
$7.21 |
Natural Gas | $158,446 | 22,349 |
MMBtu
|
$7.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $156,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $99,955 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $32,884 | $59,335 |
$32,884
346,846
kWh
|
- | |
02 | 2.6231: Utilize controls to operate equipment only when needed | $13,809 | $46,235 |
$13,809
143,398
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $1,138 | $2,588 |
$1,138
11,814
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $3,472 | $1,238 |
$3,472
36,056
kWh
|
- | |
05 | 2.7122: Disconnect ballasts | $20,420 | $3,787 |
$20,420
212,044
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,485 | $6,134 |
$1,485
15,416
kWh
|
- | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $14,975 | $17,104 | - |
$14,975
-
MMBtu
|
|
08 | 2.2135: Repair and eliminate steam leaks | $26,809 | $375 | - |
$26,809
-
MMBtu
|
|
09 | 2.2136: Install / repair insulation on steam lines | $3,755 | $1,092 | - |
$3,755
-
MMBtu
|
|
10 | 3.1191: Change procedures / equipment / operating conditions | $6,425 | $595 | - |
$6,425
-
MMBtu
|
|
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $29,066 | $2,000 |
$29,066
335,365
kWh
|
- | |
12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,221 | $3,340 |
$2,221
23,067
kWh
|
- | |
TOTAL RECOMMENDED | $156,459 | $143,822 |
$104,495
1,124,005
kWh
|
$51,964
-
MMBtu
|
||
TOTAL IMPLEMENTED | $99,955 | $63,449 |
$69,390
754,092
kWh
|
$30,564
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs