| Assessment Year | 2010 |
|---|---|
| Principal Product | Refurbished airplane parts |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
128,400
ft2
|
| Annual Production | 1,980
pieces
|
| Production Hrs. Annual | 6,570
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $464,703 | 7,435,200 |
kWh
|
$0.063 |
| Natural Gas | $24,600 | 2,817 |
MMBtu
|
$8.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $112,996 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $99,502 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,017 | $6,215 |
$10,017
44,928
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $8,400 | $1,550 |
$8,400
194,400
kWh
|
- | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $3,477 | $2,599 |
$3,477
62,422
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $1,998 | $13,149 |
$1,998
46,041
kWh
|
- | |
| 05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $11,414 | $51,875 |
$11,414
263,000
kWh
|
- | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $10,918 | $2,775 |
$10,918
251,917
kWh
|
- | |
| 07 | 2.3191: Use demand controller or load shedder | $30,411 | $45,000 | - |
$30,411
-
kW-mo/yr
|
|
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $23,800 | $15,600 |
$23,800
548,000
kWh
|
- | |
| 09 | 2.8121: Apply for tax-free status for energy purchases | $11,625 | - |
$11,625
-
kWh
|
- | |
| 10 | 2.8112: Combine utility meters | $936 | $175 |
$936
7,457
kWh
|
- | |
| TOTAL RECOMMENDED | $112,996 | $138,938 |
$82,585
1,418,165
kWh
|
$30,411
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $99,502 | $130,124 |
$69,091
1,310,815
kWh
|
$30,411
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs