ITAC Assessment: OK0802
ITAC logo
ITAC Assessment: OK0802
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Refurbished airplane parts
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 128,400
ft2
Annual Production 1,980
pieces
Production Hrs. Annual 6,570
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $464,703 7,435,200
kWh
Natural Gas $24,600 2,817
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $99,502

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,017 $6,215 $10,017
44,928
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $8,400 $1,550 $8,400
194,400
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $3,477 $2,599 $3,477
62,422
kWh
-
04 2.7135: Install occupancy sensors $1,998 $13,149 $1,998
46,041
kWh
-
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $11,414 $51,875 $11,414
263,000
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $10,918 $2,775 $10,918
251,917
kWh
-
07 2.3191: Use demand controller or load shedder $30,411 $45,000 - $30,411
-
kW-mo/yr
08 2.6212: Turn off equipment during breaks, reduce operating time $23,800 $15,600 $23,800
548,000
kWh
-
09 2.8121: Apply for tax-free status for energy purchases $11,625 - $11,625
-
kWh
-
10 2.8112: Combine utility meters $936 $175 $936
7,457
kWh
-
TOTAL RECOMMENDED $112,996 $138,938 $82,585
1,418,165
kWh
$30,411
-
kW-mo/yr
TOTAL IMPLEMENTED $99,502 $130,124 $69,091
1,310,815
kWh
$30,411
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs