ITAC Assessment: MZ0186
ITAC logo
ITAC Assessment: MZ0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Non-motorized Carts
NAICS 332313: Plate Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 116
Plant Area 288,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 6,360
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,933 2,637,800
kWh
Electricity Demand $20,032 7,507
kW-mo/yr
Natural Gas $166,024 19,685
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $5,513 $5,100 $5,513
88,914
kWh
-
02 2.5122: Replace high resistance ducts, pipes, and fittings $5,641 $18,600 $5,641
90,989
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $2,104 $1,160 $1,946
31,391
kWh
$158
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $83 - $83
1,342
kWh
-
TOTAL RECOMMENDED $13,341 $24,860 $13,183
212,636
kWh
$158
-
kW-mo/yr
TOTAL IMPLEMENTED $7,700 $6,260 $7,542
121,647
kWh
$158
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs