Assessment Year | 2010 |
---|---|
Principal Product | aircraft parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
150,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $409,383 | 7,467,600 |
kWh
|
$0.055 |
Electricity Demand | $144,257 | 22,437 |
kW-mo/yr
|
$6.43 |
Natural Gas | $70,670 | 13,739 |
MMBtu
|
$5.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,537 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,153 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $22,023 | $495,980 |
$22,023
409,500
kWh
|
- | - | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $7,353 | $30,200 | - | - | - |
$7,353
-
MMBtu
|
|
03 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $32,076 | - | - |
$32,076
-
kW-mo/yr
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $4,083 | $4,638 | - | - | - |
$4,083
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,871 | $1,750 |
$2,871
52,000
kWh
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $810 | - |
$810
14,727
kWh
|
- | - | - | |
07 | 2.3212: Optimize plant power factor | $3,031 | $11,550 | - | - | $3,031 | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,627 | $20,203 |
$2,627
47,771
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,084 | $9,806 |
$2,084
37,896
kWh
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $245 | $13 |
$245
4,462
kWh
|
- | - | - | |
11 | 2.2136: Install / repair insulation on steam lines | $334 | $418 | - | - | - |
$334
-
MMBtu
|
|
TOTAL RECOMMENDED | $77,537 | $574,558 |
$30,660
566,356
kWh
|
$32,076
-
kW-mo/yr
|
$3,031 |
$11,770
-
MMBtu
|
||
TOTAL IMPLEMENTED | $38,153 | $22,384 |
$5,743
104,233
kWh
|
$32,076
-
kW-mo/yr
|
- |
$334
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs