Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product aircraft parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 150,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $409,383 7,467,600
kWh
Electricity Demand $144,257 22,437
kW-mo/yr
Natural Gas $70,670 13,739
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,537 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,153

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $22,023 $495,980 $22,023
409,500
kWh
- - -
02 2.2414: Use waste heat from hot flue gases to preheat $7,353 $30,200 - - - $7,353
-
MMBtu
03 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $32,076 - - $32,076
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $4,083 $4,638 - - - $4,083
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,871 $1,750 $2,871
52,000
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $810 - $810
14,727
kWh
- - -
07 2.3212: Optimize plant power factor $3,031 $11,550 - - $3,031 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,627 $20,203 $2,627
47,771
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,084 $9,806 $2,084
37,896
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $245 $13 $245
4,462
kWh
- - -
11 2.2136: Install / repair insulation on steam lines $334 $418 - - - $334
-
MMBtu
TOTAL RECOMMENDED $77,537 $574,558 $30,660
566,356
kWh
$32,076
-
kW-mo/yr
$3,031 $11,770
-
MMBtu
TOTAL IMPLEMENTED $38,153 $22,384 $5,743
104,233
kWh
$32,076
-
kW-mo/yr
- $334
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs