ITAC Assessment: OK0786
ITAC logo
ITAC Assessment: OK0786
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Paint
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 220,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,643 5,795,200
kWh
Natural Gas $217,485 21,084
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,154 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1212: Operate boilers on high fire setting $2,348 $24,000 - $2,348
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $106 $604 $106
1,872
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $453 $3,410 $453
8,007
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $854 - $854
15,098
kWh
- -
05 2.7261: Install timers and/or thermostats $1,491 $465 $1,491
26,378
kWh
- -
06 2.8118: Check for accuracy of utility / power meters $903 - - - $903
TOTAL RECOMMENDED $6,154 $28,479 $2,904
51,355
kWh
$2,348
-
MMBtu
$903
TOTAL IMPLEMENTED $3,247 $465 $2,345
41,476
kWh
- $903
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs