ITAC Assessment: OK0785
ITAC logo
ITAC Assessment: OK0785
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Metal Processing
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 156,000
ft2
Annual Production 60,000
ton
Production Hrs. Annual 5,840
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,360 1,325,360
kWh
Natural Gas $25,878 3,050
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,518 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,447

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $7,282 $55,440 - $7,282
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,202 $3,000 $5,202
68,007
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,225 $56,686 $14,225
186,337
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $644 $5,222 $644
8,424
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,602 - $2,602
34,013
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $563 - $563
7,352
kWh
-
TOTAL RECOMMENDED $30,518 $120,348 $23,236
304,133
kWh
$7,282
-
MMBtu
TOTAL IMPLEMENTED $10,447 $55,440 $3,165
41,365
kWh
$7,282
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs