ITAC Assessment: UM0387
ITAC logo
ITAC Assessment: UM0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Cement
NAICS 327310: Cement Manufacturing
SIC 3241: Cement, Hydraulic
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 500,000
ft2
Annual Production 500,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,000,000 200,000,000
kWh
Natural Gas $2,958,153 561,000
MMBtu
Coal $5,800,000 1,100,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $398,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings
01 2.1212: Operate boilers on high fire setting $48,827 $157,500 $48,827
976,546
kWh
- -
02 2.3321: Use steam pressure reduction to generate power $139,284 $750,000 $139,284
2,785,680
kWh
- -
03 2.2437: Recover waste heat from equipment $131,444 $85,000 - - $131,444
-
MMBtu
04 2.2437: Recover waste heat from equipment $57,295 $12,490 - - $57,295
-
MMBtu
05 2.2437: Recover waste heat from equipment $21,900 $55,250 - $21,900
-
MMBtu
-
TOTAL RECOMMENDED $398,750 $1,060,240 $188,111
3,762,226
kWh
$21,900
-
MMBtu
$188,739
-
MMBtu
TOTAL IMPLEMENTED - - - - -