| Assessment Year | 2009 |
|---|---|
| Principal Product | Furniture and Fabrication of wood and metal |
| NAICS | 337127: Institutional Furniture Manufacturing |
| SIC | 2599: Furniture and Fixtures, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
100,000
ft2
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $91,491 | 1,052,800 |
kWh
|
$0.087 |
| Natural Gas | $8,622 | 744 |
MMBtu
|
$11.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,257 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,196 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $607 | $1,902 |
$607
6,982
kWh
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,831 | - |
$3,831
47,484
kWh
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $365 | $1,154 |
$365
4,201
kWh
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $229 | $1,891 |
$229
2,359
kWh
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $825 | $5,760 |
$825
8,910
kWh
|
|
| 06 | 4.611: Begin a practice of predictive / preventative maintenance | $400 | - |
$400
-
kWh
|
|
| TOTAL RECOMMENDED | $6,257 | $10,707 |
$6,257
69,936
kWh
|
||
| TOTAL IMPLEMENTED | $4,196 | $1,154 |
$4,196
51,685
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs