ITAC Assessment: OK0774
ITAC logo
ITAC Assessment: OK0774
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Furniture and Fabrication of wood and metal
NAICS 337127: Institutional Furniture Manufacturing
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 100,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,491 1,052,800
kWh
Natural Gas $8,622 744
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,196

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $607 $1,902 $607
6,982
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,831 - $3,831
47,484
kWh
03 2.4221: Install compressor air intakes in coolest locations $365 $1,154 $365
4,201
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $229 $1,891 $229
2,359
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $825 $5,760 $825
8,910
kWh
06 4.611: Begin a practice of predictive / preventative maintenance $400 - $400
-
kWh
TOTAL RECOMMENDED $6,257 $10,707 $6,257
69,936
kWh
TOTAL IMPLEMENTED $4,196 $1,154 $4,196
51,685
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs