ITAC Assessment: UL0219
ITAC logo
ITAC Assessment: UL0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Injection Molded Automotive Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 60,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,802 5,067,409
kWh
Electricity Demand $44,668 1,173
kW-mo/yr
Electricity Fees $425 -
Natural Gas $3,278 496
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $563 $20 $473
12,896
kWh
$90
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $8,356 $24,627 - $8,356
-
kW-mo/yr
- -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $191 - - - $191
-
lb
-
04 3.4155: Meter waste water $4,053 - - - - $4,053
05 4.521: Clear and rent existing space $2,520 $300 - - - $2,520
06 4.421: Modify current incentive program $4,514 $60 - - - $4,514
TOTAL RECOMMENDED $20,197 $25,007 $473
12,896
kWh
$8,446
-
kW-mo/yr
$191
-
lb
$11,087
TOTAL IMPLEMENTED $20,197 $25,007 $473
12,896
kWh
$8,446
-
kW-mo/yr
$191
-
lb
$11,087
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs