Assessment Year | 2009 |
---|---|
Principal Product | Metal Finishing |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 95 |
Plant Area |
50,000
ft2
|
Annual Production | 480,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $133,228 | 1,686,283 |
kWh
|
$0.079 |
Natural Gas | $190,054 | 16,104 |
MMBtu
|
$11.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,113 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,160 | - |
$7,160
90,630
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,160 | - |
$7,160
90,630
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,094 | $353 |
$1,094
13,853
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $4,498 | $2,767 | - |
$4,498
-
MMBtu
|
- | |
05 | 2.1212: Operate boilers on high fire setting | $4,261 | $17,500 | - |
$4,261
-
MMBtu
|
- | |
06 | 4.611: Begin a practice of predictive / preventative maintenance | $400 | - | - | - | $400 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,532 | $2,954 |
$2,532
30,930
kWh
|
- | - | |
08 | 2.2136: Install / repair insulation on steam lines | $4,295 | $953 | - |
$4,295
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $31,400 | $24,527 |
$17,946
226,043
kWh
|
$13,054
-
MMBtu
|
$400 | ||
TOTAL IMPLEMENTED | $21,113 | $20,454 |
$16,852
212,190
kWh
|
$4,261
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs