ITAC Assessment: OK0770
ITAC logo
ITAC Assessment: OK0770
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Electric Motors and Drives
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 296
Plant Area 160,000
ft2
Annual Production 220,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $475,169 6,132,000
kWh
Natural Gas $71,845 6,514
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,776

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,297 - $7,297
124,100
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,597 - $2,597
39,713
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $669 $1,056 $669
10,234
kWh
-
04 2.2437: Recover waste heat from equipment $8,014 $5,534 - $8,014
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,686 $17,885 $4,686
56,010
kWh
-
06 2.7243: Improve air circulation with destratification fans / other methods $1,894 $1,346 $1,894
28,968
kWh
-
07 2.6218: Turn off equipment when not in use $16,527 - $16,527
252,703
kWh
-
TOTAL RECOMMENDED $41,684 $25,821 $33,670
511,728
kWh
$8,014
-
MMBtu
TOTAL IMPLEMENTED $31,776 $18,941 $31,776
482,760
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs