ITAC Assessment: OK0764
ITAC logo
ITAC Assessment: OK0764
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Customized rubber and plastic
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 150,000
ft2
Annual Production 600,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,667 2,200,800
kWh
Natural Gas $129,922 15,483
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,878 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $3,109 $5,086 - $3,109
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,596 $14,878 $1,596
29,390
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $477 $1,165 $477
4,836
kWh
-
04 2.2136: Install / repair insulation on steam lines $22,038 $14,300 - $22,038
-
MMBtu
05 4.611: Begin a practice of predictive / preventative maintenance $7,000 - $7,000
-
kWh
-
06 2.2153: Close off unneeded steam lines $7,161 - - $7,161
-
MMBtu
07 2.2113: Repair or replace steam traps $28,620 $23,375 - $28,620
-
MMBtu
08 2.1241: Reduce excessive boiler blowdown $2,877 - - $2,877
-
MMBtu
TOTAL RECOMMENDED $72,878 $58,804 $9,073
34,226
kWh
$63,805
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs